Toyota invests $8 billion to expand battery manufacturing

Toyota invests $8 billion to expand battery manufacturing

With this new investment, Toyota plans for 10 new BEV/PHEV battery lines by 2030.

Toyota invested nearly $8 billion which will add approximately 3,000 jobs at Toyota Battery Manufacturing North Carolina (TBMNC). This brings total investment to approximately $13.9 billion and job creation to more than 5,000, Toyota said, further supporting Toyota’s multi-pathway approach to global vehicle electrification.

Toyota said this investment adds capacity to support battery electric vehicles (BEV’s) and plug-in hybrid electric vehicles (PHEV’s). An additional eight BEV/PHEV battery production lines will be added to the two previously announced, for a total of 10 BEV/PHEV battery lines. In addition, as originally announced, the plant will also have four battery lines for Hybrid Electric Vehicles (HEVs). Production will be increased in a phased approach, with line launches planned through 2030 to reach a total production of more than 30 GWh annually.

In 2021, Toyota, in partnership with Toyota Tsusho, announced the new Liberty location with an initial investment of $1.29 billion for battery production and the creation of 1,750 new jobs. With this announcement, Toyota said its North Carolina location solidifies its position as the company’s epicenter of lithium-ion battery production in North America. Overall, the campus will boast seven million square feet, equating to 121 football fields of battery production.

Toyota said it has put more than 24.6 million hybrid, plug-in hybrid, fuel cell and battery electric vehicles on the road globally. By 2025, the company said it plans to have an electrified option available for every Toyota and Lexus model globally.

You May Also Like

Gage Zero to develop an EV fleet charging hub in Texas

The company will develop, own and operate the AllianceTexas EV charging hub as part of its network of sites planned throughout the U.S.

Gage_Zero-hub-rendering

Gage Zero, an Austin-based fleet electrification solutions company that deploys and operates EV charging infrastructure, and Hillwood revealed plans to develop a Texas-based commercial EV charging facility, catering to trucks and last-mile fleets. The facility will be within AllianceTexas' 27,000-acre mixed-use development. AllianceTexas is a global logistics hub consisting of the AllianceTexas Mobility Innovation Zone (MIZ), BNSF Alliance Intermodal Facility, one of the largest intermodal hubs in the nation, Perot Field Fort Worth Alliance Airport (AFW) and has direct access to I-35W and State Highway 170.

BP Pulse opens Gigahub in Houston

BP said its new BP Pulse station is the first BP Pulse-branded Gigahub in the US and opened to the public on April 2.

bp-pulse-Houston
Phoenix Motor, InductEV partner on wireless charging solution for commercial vehicles

This partnership will provide Phoenix’s customers with the option to select wireless inductive charging for use in duty cycles and recurring routes.

Phoenix-at-PortofLA
Research finds that caffeine boosts platinum electrode performance

This discovery has the potential to reduce platinum requirements, making fuel cells more affordable and efficient, the researchers said.

Caffeine-stock
FLO survey: most drivers rely on fast chargers for long trips

Conducted last year, FLO said the survey supports the buildout of its own-and-operate network of fast chargers.

FLO_Survey

Other Posts

2025 Toyota Camry to be exclusively sold as a hybrid

The 2025 Toyota Camry is expected to arrive at Toyota dealerships in late spring 2024 with a starting MSRP of $28,400.

2025_Camry_XSE_AWD
Honda to build EV factory, EV battery plant in Ontario

The EV plant will have a production capacity of 240,000 EVs per year and the EV battery plant will have a capacity of 36 GWh per year.

Green Li-ion launches recycled lithium-ion battery materials plant

The North American plant will produce battery-grade cathode and anode materials.

Green-Li-ion-plant
LG Energy Solution’s $5.5B battery facility to be completed by 2026

LG Energy Solution said the cylindrical battery plant, called LG Energy Solution Arizona, will produce 46-Series batteries for EVs.

LGES_Arizona-Construction