WattEV awarded $40.5M to build truck charging depots
WattEV secured two grants to expand its network of electric truck stops into Northern California and Oregon.
WattEV HD sets grand opening for charging depot
The WattEV charging depot features 5MW of initial capacity for concurrent charging of 26 trucks from its 360KW chargers.
WattEV Long Beach HD truck charging depot goes public
On opening, WattEV’s charging plaza will feature 26 charging bays providing power at up to 360 kilowatts.
WattEV to build electric-truck charging station at Port of Long Beach
WattEV and the Port of Long Beach have announced plans for WattEV to build a charging plaza for heavy-duty electric trucks inside the port complex. Salim Youssefzadeh, chief executive officer of WattEV– alongside Port of Long Beach Executive Director Mario Cordero – announced the project during the annual Advanced Clean Transportation Expo industry conference at the
WattEV orders 50 Volvo VNR Electric Trucks for truck-as-a-service startup
Volvo Trucks North America’s customer WattEV has ordered 50 Class 8 Volvo VNR Electric trucks to launch its Truck-as-a-Service (TaaS) model in California. WattEV’s TaaS model provides shippers and carriers access to battery-electric trucks at a per-mile rate, including charging, that is on par with the total cost of operating diesel trucks, the company says.
WattEV installing California’s first solar-powered ‘electric truck stop’
WattEV also says it plans to run its own fleet of 30 heavy-duty electric trucks by the end of 2022.